Daily Production Report Template

The record of what actually happened, against what was planned. The DPR is how a production knows whether it is ahead or behind — and it is the document that settles disputes months later.

Download CSVPrint / Save as PDFFree · no email required

What is a daily production report?

A daily production report, or DPR, records what a production actually achieved on a shoot day — scenes and pages completed, setups shot, actual call and wrap times, meal breaks, overtime, and any incidents. It is compared against the schedule to track whether the production is ahead, on, or behind plan.

The template, field by field

Header and times

FieldWhat it's forRequired
Production and day numberDay n of total, matching the call sheet and schedule.Required
Date and locationWhere the day actually shot, which is not always where it was scheduled.Required
Crew call — scheduled vs actualBoth. The gap between them is the first sign of a day going wrong.Required
First shotWhen camera actually rolled. The single best measure of how efficiently the day started.Required
Meal breaksStart and end of each break. Late or missed meals trigger penalties on most agreements.Required
Camera wrap and crew wrapBoth times, since they differ and turnaround is calculated from crew wrap.Required
Total hours and overtimeHours worked and any overtime incurred, per department where it differs.Required

Work completed

FieldWhat it's forRequired
Scenes scheduled vs completedWhat the call sheet said, and what actually got shot.Required
Pages scheduled vs completedIn eighths. The primary progress metric across the production.Required
Setups completedNumber of camera setups achieved, which often explains a page count better than the pages do.Required
Scenes part-shot or droppedAnything incomplete or pushed, which must be rescheduled.Required
Running totalsCumulative scenes and pages against the total, showing ahead or behind at a glance.Required

Cast, crew and incidents

FieldWhat it's forRequired
Cast workedWhich cast IDs worked, held or travelled — reconciled against the Day Out of Days.Required
Crew headcountTotal crew present, plus any additions or absences.Optional
Background numbersExtras actually used against those booked.Optional
Accidents and incidentsAnything requiring first aid or a report. This is the field that matters legally.Required
Equipment issuesFailures, damage or losses affecting the day.Optional
WeatherActual conditions, particularly where they affected the day.Optional
NotesWhy the day went as it did. Written the same day, while it is still accurate.Required

How to complete a daily production report

  1. 1

    Record times as they happen

    Call, first shot, meals, wrap. Reconstructing times at the end of the day produces numbers that will not survive a payroll query.

  2. 2

    Track scenes and pages against the call sheet

    The comparison is the point. A DPR that only records what was shot, without what was planned, cannot tell you anything about progress.

  3. 3

    Count setups as well as pages

    Page count alone misleads. Two pages across eighteen setups is a much harder day than four pages across six.

  4. 4

    Reconcile cast against the DOOD

    Confirm who worked, held or travelled. This is what payroll pays from, and errors here are expensive and slow to unwind.

  5. 5

    Log meal breaks precisely

    Late or missed meals trigger penalties under most agreements. Vague times become disputes.

  6. 6

    Record incidents immediately

    Any injury, near miss or damage goes in the same day, in plain language. This is the field that matters if anything is ever contested.

  7. 7

    Update the running totals

    Cumulative pages and scenes against the total tell the producer whether the schedule still holds. Distribute the same day.

Hard-won tips

  • Setups completed explains a day better than pages shot. Track both or you will misdiagnose why a day ran long.
  • The gap between scheduled and actual first shot is the most diagnostic number on the report. Consistently late first shots point at a fixable process problem.
  • Record incidents the same day, in plain language. Memory is not evidence.
  • Reconcile cast status against the DOOD daily. Payroll errors compound and are painful to unwind weeks later.
  • Distribute the DPR the same evening. A report nobody reads until Monday cannot change Friday's plan.

FAQ

Frequently Asked Questions

What is a DPR?
A daily production report — the record of what a production actually achieved on a shoot day, compared against what was scheduled. It covers times, scenes and pages completed, cast worked, overtime and incidents.
Who prepares the daily production report?
Usually the 2nd Assistant Director or production coordinator, reviewed by the production manager or line producer before distribution.
How is it different from a call sheet?
A call sheet is the plan issued before the day. A DPR is the record produced after it. Comparing the two is how a production knows whether it is on schedule.
Why does it track setups as well as pages?
Page count alone is a poor measure of difficulty. Two pages across eighteen setups is a far harder day than four pages across six, and only the setup count reveals that.
Who receives the DPR?
Producers, the production manager, the line producer, and often financiers or completion bond representatives on larger productions.
Why do meal break times matter so much?
Most agreements impose penalties for late or missed meals. Imprecise times turn into payroll disputes, so they are recorded exactly.

Get the rest of the templates

Call sheets, breakdown sheets, DOOD grids and budget tops — plus a note when a new one goes up.

No spam, and unsubscribe from anything we send. See how we handle your address in the privacy policy.

Stop filling this in by hand.

ScenePaper generates this from the work you've already done — free to start, zero commission.

PRODUCTIONSCENEPAPER
SCENE1
TAKE1
ROLLA
DIRECTORYOUR NEXT PRODUCTION