The problem
A performer works on day 3. They work again on day 14. Between those days they don't appear in a single scene.
Under most engagement terms, you pay for days 4 through 13 anyway. They're hold days — the performer is retained, unavailable to other work, and compensated for it.
Ten paid days. Zero minutes on camera.
Multiply that across a cast and hold days become one of the largest avoidable costs in a production budget. They're also close to invisible unless you go looking, because they don't appear as a line item anywhere — they're buried in the Day Out of Days.
What drop and pickup is
Drop and pickup releases a performer during a long gap and re-engages them afterwards. You pay for the days they work, not the gap.
On the DOOD it shows as D at the drop and P at the pickup, with the intervening days carrying no status for that performer.
The rules
This is contractual, not a scheduling trick, and the terms vary by agreement and region. Common conditions:
- A minimum gap. Most agreements set a threshold — often around 10 days — before a drop is permitted. You can't drop someone for a three-day gap.
- Notice requirements. The performer usually must be told in advance, not on the day.
- A minimum re-engagement. The pickup often carries its own guaranteed minimum days.
- Not always permitted at all. Some agreements and some individual deals prohibit it outright.
Check the actual agreement before scheduling around it. A drop that breaches terms costs more than the hold days would have.
The better fix: reorder first
Drop and pickup is the remedy when a gap is unavoidable. It's not the first thing to reach for.
The first thing is to change the schedule so the gap doesn't exist.
If a performer works day 3 and day 14, ask what's actually forcing that. Often it's:
- Their scenes are at two locations scheduled far apart
- One scene is grouped with another performer's availability window
- Nobody looked, because the DOOD was generated once and never revisited
Pulling those two scenes closer together eliminates ten paid days at no contractual risk. That's strictly better than dropping.
This is why what-if scheduling matters. Clone the board, pull the performer's scenes together, and compare total hold days across the cast. Sometimes the reorder costs you a company move and it's still worth it. Sometimes it costs nothing and nobody had checked.
Reading the DOOD for money
The Day Out of Days has a hold-days column. Almost nobody reads it during scheduling, and it's where the money is.
What to look for:
Long single gaps. One performer with a ten-day hold is the obvious drop-or-reorder candidate.
Scattered day players. Several one-day performers spread across separate days often merge into fewer days with minor reordering — and each merge can eliminate a hold pattern.
Cast held across a location block. A performer held while the unit shoots somewhere they don't appear is pure waste and usually fixable.
Total hold days across the cast. This single number is the best available measure of schedule efficiency, and comparing it between two scenarios is the fastest way to tell which schedule is better.
Practical sequence
- Build the schedule optimising for location grouping first
- Generate the DOOD and read the hold-day totals
- Identify the worst offenders
- Try reordering to close the gaps — compare scenarios rather than editing in place
- Where a gap genuinely can't close, check whether drop and pickup is permitted
- Confirm notice requirements and minimum re-engagement before committing
- Regenerate the DOOD after every change, because a stale one is worse than none
The short version
Hold days are real money spent on people doing nothing, and they hide in a column nobody reads. Reorder to eliminate them where you can, drop and pickup where you can't, and check the agreement before you assume you're allowed to.
Frequently Asked Questions
What is drop and pickup in film scheduling?+
Releasing a performer during a long gap between their work days and re-engaging them afterwards, so the production doesn't pay hold days across the gap. It appears on the Day Out of Days as D at the drop and P at the pickup.
What is a hold day?+
A day when a performer is retained between two work days but doesn't appear in any scene. Hold days are normally paid, making them one of the largest avoidable costs in a production budget.
What are the rules for drop and pickup?+
They vary by agreement and region, but commonly include a minimum gap before a drop is permitted (often around 10 days), advance notice requirements, and a guaranteed minimum on re-engagement. Some agreements prohibit it entirely.
Is it better to drop a performer or reorder the schedule?+
Reorder first. Pulling a performer's scenes closer together eliminates hold days with no contractual risk. Drop and pickup is the remedy when a gap genuinely can't be closed.
How do I find hold days in my schedule?+
Read the hold-days column on the Day Out of Days. Look for long single gaps, scattered day players who could be merged, and cast held while the unit shoots somewhere they don't appear.
What's the best measure of schedule efficiency?+
Total hold days across the cast, alongside company move count. Comparing those two numbers between competing schedule scenarios is the fastest way to tell which is genuinely better.
About the author
Geenesh S
Founder & Editor, ScenePaper
Builds and runs ScenePaper. Writes about how film production actually schedules, budgets and hires — and where the paperwork breaks.
More from Geenesh STools for production
- Call Sheet Software — Build, send, and track call sheets with read receipts and turnaround checks.
- Film Scheduling Software — Stripboard scheduling, shoot days, and Day-Out-of-Days generation.
- Script Breakdown Software — Tag elements scene by scene and generate breakdown sheets.
- Free Call Sheet Template — A working call sheet layout you can fill in today.