Skip to content
Glossary

Scheduling

Hold day

What is hold day in film production?

A hold day is a day on which a performer is contractually retained and paid but not called to set. It sits between their first and last working day, keeping them exclusive to the production and unavailable to take other work.

Hold days are the direct cost of shooting out of order. They are not waste — the alternative is losing the performer — but a schedule that generates long runs of them is usually one that grouped by location when it should have grouped by cast.

Reviewed

Related terms

Day Out of Days
A Day Out of Days is a grid showing which cast and crew are required on which shooting days. Each row is a person, each column a day, and each cell is marked with a status code — start work, work, hold, drop, or finish. It is the document contracts and payroll are built from.
Drop and pickup
Drop and pickup is a scheduling provision that lets a production stop paying a performer during a gap between their working days, then re-engage them later. The performer is dropped after one day and picked up on a later one, with the intervening hold days not paid.
PRODUCTIONSCENEPAPER
SCENE1
TAKE1
ROLLA
DIRECTORYOUR NEXT PRODUCTION